Merge accepted main probe baseline before maintenance checks
This commit is contained in:
@@ -21,7 +21,8 @@ philosophy so they share a view of the whole process).
|
||||
field it must not use. No plan tools, no jobs, no demos.
|
||||
- **The teacher** runs everything from planning onward: full tool set
|
||||
(teach quiz with nodeId, plan_init, jobs, demos). Constructed the moment the
|
||||
transcript carries a `probe_done`.
|
||||
transcript carries a concluded `probe_done`: a non-failed/non-aborted
|
||||
assistant call followed by a matching successful tool result.
|
||||
- **The swap happens between probing and planning** — the planning phase
|
||||
needs full knowledge of how teaching is done, so the teacher agent starts
|
||||
at planning.
|
||||
@@ -43,6 +44,12 @@ The prober concludes explicitly:
|
||||
- **Refuses while a question is open** ("resolve the open question first") —
|
||||
same doctrine as nodeId validation.
|
||||
- **Refuses a second conclusion** (idempotent: the probe concludes once).
|
||||
Conclusion requires a later `probe_done` result matching the call's ID
|
||||
and tool name. The calling generation must not have failed or aborted;
|
||||
the result must not be `isError` or explicitly contain `details.ok:false`.
|
||||
Clean acknowledgments without an explicit `ok:true` remain valid. Bare,
|
||||
unmatched, errored, or refused calls keep probing open; saved attempts
|
||||
are never deleted or replay-executed by this detection rule.
|
||||
- The assessment is the tool call's input, so it streams to the learner live
|
||||
and is durable in the transcript by the tool result itself. A dedicated
|
||||
assessment card/viewer comes later (UI).
|
||||
@@ -53,7 +60,7 @@ The prober concludes explicitly:
|
||||
- **Side effect: it queues the handoff.** When the prober's turn ends, the
|
||||
wake pipeline (the same machinery that delivers sub-agent results and
|
||||
abort steers) fires a server-side turn with a handoff steer — the teacher
|
||||
is constructed (probe_done is in the transcript) and authors the plan.
|
||||
is constructed (probe_done has successfully concluded) and authors the plan.
|
||||
The learner experiences assessment → plan as one continuous flow. If the
|
||||
wake is lost (crash window), the next client message still constructs the
|
||||
teacher — the transcript is the source of truth.
|
||||
|
||||
Reference in New Issue
Block a user