Gate 3 results — tree panel + graph-personalized probing PASSED; plan fully executed
This commit is contained in:
+2
-2
@@ -172,8 +172,8 @@ The teacher's context window and attention are precious — it has the lesson to
|
||||
1. **Plan-tree tools + session state** — structured tools, tree persisted in the chat store, `set_current` tracking. (Everything else depends on this.) **✅ Wave 1 (W1): 8 DAG-validated tools, prompt fragment, live-verified (plan_init + set_current in a real session).**
|
||||
2. **Bare-bones global graph + home view** — live emission from tree tools into a graph store, naive-union merge, home page renders it with the chosen lightweight renderer. *This is the "see something appear even from a partial session" milestone.* **✅ Wave 2 (W4): JSONL ledgers, idempotent emission, sigma.js + forceAtlas2 home view, foldStaleChats catch-up. Live-verified.**
|
||||
3. **Phase separation** — probe/teach marker, transcript divider, collapsed teach-phase checks. **✅ Wave 2 (W5): phaseAt from first plan_init, "Teaching · N nodes" divider, invitation bar + reveal. Live-verified.**
|
||||
4. **Right-panel tree view** — persistent, current-position highlight.
|
||||
5. **Background consolidation** — merge adjudication, calibration, prose-only edges.
|
||||
4. **Right-panel tree view** — persistent, current-position highlight. **✅ Wave 3 (W7): topo order, done/current/next/upcoming, progress header, collapse-to-rail persisted. Live-verified.**
|
||||
5. **Background consolidation** — merge adjudication, calibration, prose-only edges. **◐ Wave 3 (W8, lite): exact/alias-match merge + graph-as-context injection (whole graph while small, 150-node cap with hotspot+1-hop truncation). Live-verified personalization. Full embed+adjudication merge and calibration rubric remain deferred.**
|
||||
6. **Demo capability** — the `demo` artifact contract (sandboxed iframe, error-fix loop) + the **demo-builder sub-agent** that tests code before delivery (§2.5). High value; slots in any time after step 1. **✅ Wave 2 (W6): demo + visual tools, verifying builders (headless Chrome), sandboxed demo card, SVG card. Live-verified (visual needs a vision-capable LH_VISUAL_MODEL).**
|
||||
6b. **Researcher tool** — fact verification for the teacher (§2.5); cheap port of proven pi pieces. **✅ Wave 1 (W2): async job protocol, live activity card, sourced brief, teacher continuation. Live-verified.**
|
||||
7. **Presentation fixes** — LaTeX delimiters, line breaks, mermaid integration. **✅ Wave 1 (W3): \(…\)/\[…\] contract ($ literal forever), remark-breaks, dark mermaid + styled streamdown chrome. Live-verified.**
|
||||
|
||||
Reference in New Issue
Block a user